• <tr id="qyy0u"></tr>

    <th id="qyy0u"></th>

    <code id="qyy0u"><small id="qyy0u"></small></code>
  • <tr id="qyy0u"></tr><center id="qyy0u"><small id="qyy0u"><track id="qyy0u"></track></small></center>
  • <th id="qyy0u"><option id="qyy0u"></option></th>

    <strike id="qyy0u"><nobr id="qyy0u"></nobr></strike>

    <th id="qyy0u"><option id="qyy0u"></option></th>
    <th id="qyy0u"></th>
    <big id="qyy0u"></big>
  • <tr id="qyy0u"></tr>

  • <th id="qyy0u"><option id="qyy0u"></option></th>

  • Your Location:  Technology Innovation Equipment Manufacturing

    Equipment Manufacturing

    I. Brief Introduction for Equipment Manufacturing of Heater & Reformer

    Equipment and Manufacturing is one main business of Shanghai Baoye Group, the achievement is improved year by year in the industrial area of heater, reformer and prefabricated piping assembly. Shanghai Baoye provides services for CNOOC, Air Liquide, Mitsubishi Chemical Corporation, KNPC, etc. and sells the products to Kuwait, Iran, Turkey, Canada, Trinidad and other countries.



    II. Design Capacity

    1. BIM


    2. Intelligent Pipeline Section Design


    3. X-Steel (3D Model)







    III. Process

    1. Automatic Welding of Pipe


    2. Pre-fabrication for Pipe



    3. Trial Assembly of Wall Panel



    4. Components Delivering of Reformer



    5. Convection Module of Heater



    6. Stack of Heater



    7. Convection Section of Heater





    IV. Application Cases

    1. CBDC project
    Work Scope: Materials Supply, Fabrication & Assembly
    Site: ABU Dhabi
    Year: 2013


    2. TMD Project
    Work Scope: Materials Supply, Fabrication, Modularization, Piping/Coil Fabrication & Lining installation, RO-RO onto the vessel
    Site: Trinidad
    Year: 2016


    3. ARP STAR Project
    Work Scope: Heater Supply & Fabrication & Lining installation, Coil Fabrication &Modularization
    Site: Turkey
    Year: 2014


    4. KNPC ZOR Project
    Work Scope: Steelworks and Fabrication Lining Installation, Coil Fabrication & Modularization
    Site: Kuwait
    Year: 2016


    5. Hydrogen reformer project in Caojing industrial district
    Work Scope: Materials Supply, Fabrication & Assembly
    Site: China
    Year: 2010


    6. Project Name: Steam Reformer for Methanol Unit of 600 Thousand Tons/Year
    Work Scope: Materials Supply, Fabrication & Assembly
    Site: China
    Year: 2005


     

     

  • <tr id="qyy0u"></tr>

    <th id="qyy0u"></th>

    <code id="qyy0u"><small id="qyy0u"></small></code>
  • <tr id="qyy0u"></tr><center id="qyy0u"><small id="qyy0u"><track id="qyy0u"></track></small></center>
  • <th id="qyy0u"><option id="qyy0u"></option></th>

    <strike id="qyy0u"><nobr id="qyy0u"></nobr></strike>

    <th id="qyy0u"><option id="qyy0u"></option></th>
    <th id="qyy0u"></th>
    <big id="qyy0u"></big>
  • <tr id="qyy0u"></tr>

  • <th id="qyy0u"><option id="qyy0u"></option></th>